OLG Services provided general contracting for the 4,000 sq ft addition to Thomas Magnet School, which includes four new classrooms seamlessly connected to the existing building. The single-story structure is constructed with CMU and steel on a metal deck, ensuring durability and alignment with the school’s existing infrastructure.









